About a week
Up to 3 pages, one revision round, content provided up front. Built to launch fast once the basics are in hand. See what's included.
Less than most people expect, if the content is ready. The build itself usually isn't the slow part — waiting on text, photos, and feedback is.
A template-based layout with your content ready to go can move fast. What stretches a timeline out isn't the number of pages — it's custom design decisions, features that need to be built from scratch, and how quickly each side responds during revisions.
Up to 3 pages, one revision round, content provided up front. Built to launch fast once the basics are in hand. See what's included.
More structure, stronger copy support, and launch polish. Timing depends mostly on how quickly content and feedback come back.
Directories, booking, or custom PHP tools get a timeline based on the actual feature list, not a standard build schedule.
A project with page text, business details, and photos ready on day one moves in a straight line. A project that starts with "we'll figure out the content as we go" almost always takes longer — not because the build is harder, but because there's more waiting in between steps.
Compare the Starter Launch Site against Essential and Business plans, then start whenever your content is ready.